Thank you for your interest in ESI’s Fall 2006 Limited-Term RFP
  • ESI has concluded its review and evaluation of the proposals submitted in response to the Fall 2006 Limited-Term RFP for incremental resources.
     
  • As a result of the evaluation of the proposals for incremental resources, ESI has executed the following Definitive Agreements and submitted them for regulatory approval:
     
           
  • Two (2) Dispatchable MUCPA proposals, totaling 580 MW
     
  • ESI is in the process of completing the evaluation of proposals for the purpose of determining whether any additional System generation may be displaced by such proposals.
     
  • As a result of the accelerated consideration of two proposals in the displacement analysis, ESI has executed the following Definitive Agreements and submitted them for regulatory approval:
     
           
  • Two (2) Hour Ahead Peaking MUCCO products, totaling 200 MW
     
  • ESI expects to finalize the displacement analysis process by the end of June 2007 with any Bidders being notified of an award by June 29, 2007.
     
     
    ESI reserves the right to cancel, modify or withdraw this RFP and to revise the schedule specified above in order to meet its identified objectives.

    All of the following documents are in Adobe Acrobat, Microsoft Word or Microsoft Power Point format as indicated.


    
Fall 2006 Limited-Term RFP Document
Fall 2006 Limited-Term RFP Document
    
Appendix A - Glossary
Appendix A - Glossary
    
Appendix B - Bidder Registration Form
Appendix B - Bidder Registration Form
    Appendix C Appendix C - Product Packages:  
    
Appendix D - Detailed Instructions for Bidder Registration and Proposal Submission 
Appendix D - Detailed Instructions for Bidder Registration and Proposal Submission
    
Appendix E-1 - Proposal Evaluation Process Description 
Appendix E-1 - Proposal Evaluation Process Description
    
Appendix E-2 - Deliverability Evaluation Process Description 
Appendix E-2 - Deliverability Evaluation Process Description
    
Appendix F - Credit or Collateral Requirements 
Appendix F - Credit or Collateral Requirements
    
Appendix G - Process for Protection of Proposal Information  
Appendix G - Process for Protection of Proposal Information
    
Appendix H - Description of Strategic Supply Resource Plan and Portfolio Design Considerations  
Appendix H - Description of Strategic Supply Resource Plan and Portfolio Design Considerations
    Model Contracts Model Contracts:
    
Independent Monitor Proposed Scope Of Work Activities  
Independent Monitor Proposed Scope Of Work Activities
     
    Affiliate Rules Compliance
     
    
ESI Addendum Response to Q Bid 11 (10-24-06)
ESI Addendum Response to Q Bid 11 (10-24-06)
    
ESI Response to Comments (10-20-06)
ESI Response to Comments (10-20-06)
    
LPSC Staff Comments (10-20-06)  
LPSC Staff Comments (10-20-06)
    
Joint Participants Comments (10-20-06)  
Joint Participants Comments (10-20-06)
    
EnerNOC Comments (10-20-06)  
EnerNOC Comments (10-20-06)
    
System Agreement (10-12-06)  
System Agreement (10-12-06)
    
9/11/2006 Bidder’s Conference Q&A (9-25-06)  
9/11/2006 Bidder’s Conference Q&A (9-25-06)
    
9/11/2006 LPSC Technical Conference Q&A (9-22-06)  
9/11/2006 LPSC Technical Conference Q&A (9-22-06)
    
LPSC and Bidders Conference Fall 2006 Limited-Term RFP Presentation (9-11-06)  
LPSC and Bidders Conference Fall 2006 Limited-Term RFP Presentation (9-11-06)
    
LPSC and Bidders Conference Fall 2006 Limited-Term RFP Addendum-Detailed Instructions (9-11-06)  
LPSC and Bidders Conference Fall 2006 Limited-Term RFP Addendum-Detailed Instructions (9-11-06)
    
LPSC and Bidders Conference Fall 2006 Limited-Term RFP Process (9-11-06)  
LPSC and Bidders Conference Fall 2006 Limited-Term RFP Process (9-11-06)
    
LPSC and Bidders Conference Fall 2006 Limited-Term RFP Evaluation Independent Monitoring (9-11-06)  
LPSC and Bidders Conference Fall 2006 Limited-Term RFP Evaluation Independent Monitoring (9-11-06)
    
TBU Presentation (9-11-06)  
TBU Presentation (9-11-06)
    
SPP ICT System Impact Study Process Presentation (9-11-06)  
SPP ICT System Impact Study Process Presentation (9-11-06)
    
Letter to Potential Bidder  
Letter to Potential Bidder
    
Posted Notice of upcoming Fall 2006 Limited-Term RFP  
Posted Notice of upcoming Fall 2006 Limited-Term RFP
     
    Entergy Services, Inc. wishes to inform all potential bidders in the Fall 2006 Request for Proposals for Limited-Term Supply Side Resources that Entergy New Orleans, Inc. (“ENO”) may participate in one or more transactions entered into as a result of this RFP. Although ENO currently is a debtor-in-possession in Docket No. 05-17697, In Re: Entergy New Orleans, Inc., Debtor, Chapter 11 Section “B” pending before the United States Bankruptcy Court, Eastern District of Louisiana, ENO has filed a plan of reorganization and may wish to participate in one or more transactions, subject to any approvals required by the Bankruptcy Court. Any transactions would of course be subject to the execution of definitive agreements as mutually agreed upon by the parties.
     
    Links for RFP Transmission Analysis Information:
     Please note all files should be downloaded and run locally on individual PC. The models and input files should not be executed on the RFP website.
     Transmission Models Document  About the Models and Input Files Used in the 2006 Limited Term RFP
     Fall 2006 Models and Input Files (Zip File)
    Questions and Answers
    (10-30-2006)

     
     
    Redline versions of these documents


    Click here to send Questions, Comments or Suggestions.
    Should you experience any difficulties in accessing this data, please contact your local IS support group.
    Content Provider: Laura Berryman (lberrym@entergy.com)