ESI has concluded its review and evaluation of the proposals submitted in response to the 2006 Long-Term RFP.
 
As a result of the evaluation of product proposals, ESI has selected the following resources:
 
   
  •  
  • One (1) Load Following CCGT Ownership Acquisition, totaling 789 MW (nominal rating). A definitive agreement has been reached with this bidder.
     
       
  •  
  • One (1) Solid Fuel resource totaling 538 MW, which is the Little Gypsy repowering self build option identified in the RFP.
     
    Remaining Bidders have been advised that their proposals are no longer being considered.
     
    All of the following documents are in Adobe Acrobat, Microsoft Word or Microsoft Power Point format as indicated.
    To ensure proper functionality please download and save all forms (MS Word) and Excel documents locally prior to opening them.
     
    
RFP Document
RFP Document Redline versions of these documents
    Questions and Answers
    
Appendix A - Glossary of Terms
Appendix A - Glossary of Terms
    
Appendix B - Bidder Registration Form
Appendix B - Bidder Registration Form
    Appendix C Appendix C - Product Packages:  
    
Appendix D - Detailed Instructions for Bidder Registration and Proposal Submission
Appendix D - Detailed Instructions for Bidder Registration and Proposal Submission
    
Appendix E-1 - Proposal Evaluation Process Description
Appendix E-1 - Proposal Evaluation Process Description
    
Appendix E-2 - Deliverability Evaluation Process Description
Appendix E-2 - Deliverability Evaluation Process Description
    
Appendix F - Credit/Collateral Requirements
Appendix F - Credit/Collateral Requirements
    
Appendix G - Process for Protection of Proposal Information
Appendix G - Process for Protection of Proposal Information
    
Appendix H - Entergy System Strategic Supply Resource Plan - Plan Description
Appendix H - Entergy System Strategic Supply Resource Plan - Plan Description
    
Appendix I-1 - CCGT Preliminary Due Diligence List
Appendix I-1 - CCGT Preliminary Due Diligence List
    
Appendix I-2 - Solid Fuel Preliminary Due Diligence List
Appendix I-2 - Solid Fuel Preliminary Due Diligence List
     
    
Confidentiality Agreement
Confidentiality Agreement
    
Independent Monitor Scope of Work Activities
Independent Monitor Scope of Work Activities
    Affiliate Rules Compliance
     
    
Letter to Potential Bidders
Letter to Potential Bidders
    
LPSC and Bidders Conference 2006 Long-Term RFP Presentation (2-23-06) 
LPSC and Bidders Conference 2006 Long-Term RFP Presentation (2-23-06)
    
LPSC and Bidders Conference 2006 Long-Term RFP Addendum-Detailed Instructions (2-23-06) LPSC and Bidders Conference 2006 Long-Term RFP Addendum-Detailed Instructions (2-23-06)
    
TBU Presentation (2-23-06) TBU Presentation (2-23-06)
    
2/23/06 Bidder’s Conference Q&A 2/23/06 Bidder’s Conference Q&A
    
2/23/06 LPSC Technical Conference Q&A 2/23/06 LPSC Technical Conference Q&A
    
02/23/06 Bidders Conference Transcript 02/23/06 Bidders Conference Transcript
    
Written Comments Written Comments
    
Response to Written Comments Response to Written Comments
    
LPSC Comments LPSC Comments
    
Response to LPSC Comments Response to LPSC Comments
    
ESI 2006 Long-Term RFP Process Update - CCGT Candidate Proposal Bidders ESI 2006 Long-Term RFP Process Update - CCGT Candidate Proposal Bidders
    
ESI 2006 Long-Term RFP Process Update - Solid Fuel Candidate Proposal Bidders ESI 2006 Long-Term RFP Process Update - Solid Fuel Candidate Proposal Bidders
     
    2006 ESI Long-Term RFP Proposal Status
    2006 ESI Long-Term RFP Transmission Updates
     
    
Process IM Report Process IM Report
    
Evaluation IM Report Evaluation IM Report
     
    RFP Administrator's email address: lberrym@entergy.com (Laura Berryman)
     
    Links for RFP Transmission Analysis Information:
     Per the letter and statement posted above, the Bidders can use the Zip file below in PSS/E to automatically update the loadflow cases used in the TAG Initial Transmission Analysis and Detailed Transmission Evaluation.
    ChangesToRFPModels.zip
     Transmission Upgrade Cost Calculator (Excel)
      Loadflow Models:   Summer 2007   Summer 2009   Summer 2014
      MUST Input Files:  RFPMUST.zip
     

    Click here to send Questions, Comments or Suggestions.
    Should you experience any difficulties in accessing this data, please contact your local IS support group.
    Content Provider: Laura Berryman (lberrym@entergy.com)